abstract = "During this trial period should be tested site
parameters, which were designed and to perform
the calibration of the necessary technical parame-
ters that were related to the SCADA system for
continuous tracking and managementin the func-
tioning of the cellsfor wastewater treatment. The
main task of the probation of the wastewater treat-
ment station Volkovois a creation of a lending mil
in SBR bioaeration basin through which the process
will be carried out on biological treatment. It is also
necessary to create conditions for the natural cycle
of replacement of the old mill with a new mill,
which will be processed by the processing of the
line for the sludge, via centrifugation the sludge,
and its neutralization by means of liquid polyelec-
trolyte. Bearing into account that it is about a totally
new building with one integrated processing line
that contains in itself the mechanicaltreatment,
biologically treatment and the treatment of the
wastesludge, it is necessary to draw from the expe-
riences of already existing station for the treatment
of the waste water and to apply in the new treat-
ment cells as finished solutions which can also
contribute to the improvement of the work of the
treatment station for the faecal waste water. Prima-
ry results refer to the time of the deposition of the
sludge and the creation of its own active sludge in
SBR bioaeration pools and the concentration of
oxygen in the SBR bioaeration pools, through
which can be obtained the basic mathematical de-
pendence for thesuccess of the release in thetrial
operation of treatment station Volkovo.",
publisher = "Freising (Germany) : PSP and PRT",
journal = "Fresenius Environmental Bulletin",
title = "Results and experience from the new test working of the station for the purification the fecal waste water in Volkovo",
pages = "9730-9724",
number = "12A",
volume = "28"
}