Pretraživanje
Prikaz rezultata 1-2 od 2
Results and experience from the new test working of the station for the purification the fecal waste water in Volkovo
(Freising (Germany) : PSP and PRT, 2019)
During this trial period should be tested site
parameters, which were designed and to perform
the calibration of the necessary technical parame-
ters that were related to the SCADA system for
continuous tracking and ...
The technological process of solidification for the treatment of hazardous waste
(Freising : PSP - Vimy Str. 1e, 2016)
This paper presents the technological process
of solidification for the treatment of hazardous
waste in Petrochemical plant. The treatment is
based on the technological process of physical and
chemical reactions of ...